Latitude: 55.14 (55°8′24″N), Longitude: -162.2722 (162°16′20″W)
Site: www.akenergyauthority.org
- Description: "The plant will be a 375 kW, run-of-river system and is estimated to produce 1,000 MWh/yr. The project consists of a small diversion dam and intake, a 4,500-ft penstock, a Pelton impulse turbine, and 5,000 feet of access roads. " www.akenergyauthority.org
Details