Looking to have up to 9 footings dug for a deck. With the landscape, you will need to be experienced. The area for the deck has 4" to 8" rock that needs to be placed away from footings before hand digging 36" deep 16 " wide at the bottom holes and then poured. Concrete will be onsite and you will need to add anti-freeze mixture to keep nighttime temps from having adverse affects on concrete. 12" sono tubes will be used. There is one hole that runs into a portion of the sidewalk and some of that will have to be removed. Start early this week and looking for bids. Include recent experience and contact info.