Looking to redo my bathrooms and mud room. Vinyl flooring in 2 bathrooms and mud room 140 s/f total. Built in cabinets to be removed and vanities put in with new faucets (two-24 inch vanitiesin maister), new vanity tub and shower surround in other bathroom ( still figuring out what to do with main bathroom for shower) the plumbing will have to be rerouted for the new vanities and connections with splitter for water. I do not have these items on hand, but I have vanities, faucets, flooring, primer for flooring, new shower head install kit with valve, shower surround ( waiting on tub to arrive). Provide quotes and availability when responding. Must be licensed bonded insured and Provide documents prior to starting.
Discussion
By posting you agree to the Terms and Privacy Policy.