Vinyl floor, vanities, tub/shower install

Jobs

Grave ave near 6th st, Battle Ground WA

Description

Looking to redo my bathrooms and mud room. Vinyl flooring in 2 bathrooms and mud room 140 s/f total. Built in cabinets to be removed and vanities put in with new faucets (two-24 inch vanitiesin maister), new vanity tub and shower surround in other bathroom ( still figuring out what to do with main bathroom for shower) the plumbing will have to be rerouted for the new vanities and connections with splitter for water. I do not have these items on hand, but I have vanities, faucets, flooring, primer for flooring, new shower head install kit with valve, shower surround ( waiting on tub to arrive). Provide quotes and availability when responding. Must be licensed bonded insured and Provide documents prior to starting.

By:  view source

Discussion

By posting you agree to the Terms and Privacy Policy.

/
Search this area