We are looking for a person or persons to do the following work in our backyard -
1. Level and dig out the ground in two areas so that concrete slabs will come up to ground level, not above. 1st is 34" x 37", other is 8' x 10'.
2. In smaller area, move array of plastic pipes over a few feet by cutting and extending some of them (see photo). In larger area, remove the small trees and dig out roots.
3. Use forms and pour concrete in both area, so that top level of slab is even with surface of the ground.
4. Once slab is dry, assemble the Suncast Tremont 8' x 10' plastic shed on the larger slab.
We are looking for someone who is available to do this ASAP, so only respond if you are available.
Discussion
By posting you agree to the Terms and Privacy Policy.