Framer / framing crew wanted for 950 sf garage structure with living space above. Foundation is down materials ready to be purchased. Crew can bid on the whole job or owner/builder (myself) can work with an experienced framer on a per hour basis. Must have own tools, references, necessary skills, be able to show up. Not a tight time-line but want to get a roof up before it starts pouring. Possible metal roofing install also.
Discussion
By posting you agree to the Terms and Privacy Policy.