Description
We need a crew to level approx. 300 sf of existing concrete floor using self-leveling cement (grinding down is acceptable too) and pour a concrete slab - just 3" thick, 7cy 3000 PSI with fiber (no steel mesh) - smooth trawl finish - Epoxy floor will be applied on top of it 3 weeks later.
The job also requires cutting a key joint in the existing floor of approx. 14' long x 2' wide x 3" deep.
You can do the leveling of existing concrete now and the slab pouring will happen 2-4 weeks later.
We provide all materials and forming - All you have to do is level the floor, cut the key and pour the concrete, round the concrete edges and hand cut expansion joint.
We pay $ 3,000 for just labor. If you want to provide the materials as well, we'll accept a bid.
This video shows how it's done:
Please contact us ASAP (have few jobs lined up already). Texting is OK.
Discussion
By posting you agree to the Terms and Privacy Policy.