Bobcat needed for 1/2 hour

Jobs

1215 Woodcrest Lane, Hazelwood MO

Description

I need a mound of dirt 12'L x 2'W x 1/2' H moved about 40 yards to a hole that washed through in my back yard. I need it filled before it washes out even more. The hole is about 3' deep by 3' in diameter. Any extra left over from the mound can just be set on the side of the hole. Call Gary (314)477-9059

By:  view source

Discussion

By posting you agree to the Terms and Privacy Policy.

/
Search this area