Description
Removed a chimney roughly 7x3 flat roof meeting with the 2ft eve of other ridge. (See photo)
Have sheathing, 2x6, joist hanger 100 ft roll of gaf weather watch, and a gallon of 139 flex shield for seams. Got rained out today and have to tackle something else. Most of the old flashing and membrane around opening has been removed.
Full days work. 30ph i’ll be around as a set of hand taking stuff up and setting lumber etc.
Discussion
By posting you agree to the Terms and Privacy Policy.