Description
Building a pond on my side yard and looking for someone to dig the whole.
Details: About 35 feet in length. Width will vary from 5-6 feet. Depth will range from 2-6 feet. The CAVEAT is it’s on my side yard which is only 7 feet wide so most excavation equipment will not fit.
Willing to pay up to $500.
It does NOT have to be done “overnight”. Start to finish I’m looking for someone to get it dugout within a 2 week period. I will pay $125 at 25% completion, $125 at the midway way point, and the remining $250 at completion.
The extra dirt does NOT have to be hauled away but as you dig it does have to be wheelbarrowed about 100 feet to my other side yard.
I can provide two shovels and a small jack hammer with a shovel/dirt breaking attachment and one wheelbarrow.
Please text or email only. 2one4 - 2nine3 - 45two9
Discussion
By posting you agree to the Terms and Privacy Policy.