The electrician scheduled to come today canceled last minute. If possible, if someone can come today here is what I need:
1. Move 240v outlet from kitchen to garage - extend outlet about 10 feet. There is a cinderblock wall you'd need to cut through. Drop an existing 240v outlet down 2 feet.
2. Move heater and outlet 3 feet over, might involve cutting into drywall/plywood in ceiling.
3. Install 4 new outlets
4. Install 3 GFIs - not to the box but hopped off one another downstream or just separate.
I have the outlets, MC cable. I don't have romex or other cable but I am a good store runner.
Mostly need labor and you'd need to provide the drill for cutting. I have a sawzall.
I have ongoing work that will need to be done including installing and moving bathroom fan vent, replacing and updating outlets, installing ceiling fan and light fixtures.
The big work needs to be done today if possible because of the noise of cutting.
Please text or call asap if you are available, have experience, and can come today.
I pay fairly and immediately when job is done.
Discussion
By posting you agree to the Terms and Privacy Policy.