Light Landscaping /Construction Setup Work: Up to $25.00/h
Jobs
Pennsylvania Ave near Artic Ave & Penna Ave, Atlantic City NJ
Description
Looking for between three to four person(s) for the following work: Shall pay driving mileage to work site at $0.65/mile (65 cent per mile) one way. -- Day 1: Tuesday 19 July 2022: Afternoon Work (1:00pm to 6:00pm)---No Break A) Moving slate and concrete pavers up to 200lbs with hand trucks to side of home. B) Performing straight cuts on 2 x 4 lumber with circular or jig saw. C) Performing straight cuts on 2 x 3 aluminum or carbon steel tub with Band-saw D) Assembling wood forms (light use of hand drill for screws) E) Cutting plastic with scissors/carpenter knife and stapling cut plastic into wood form F) Drilling holes into 1/16" to 1/8" thick aluminum or carbon steel bearing plates G) Attaching Disc retaining nut to bearing plates via machine screws with nuts. -- Day 2: Wednesday 20 July 2022: Afternoon Work (11:00am to 6:00pm) -- 1 hour unpaid break A) Cutting #5 Grade-60 Rebar into approximately 2 foot lengths with Band-saw B) Cutting 1-inch diameter circular tubes with Band-saw C) Cutting 5/8-11 threaded bars into 6-inch lengths D) Assembling 1st set of rebar lattices (6in x 6in-squares consisting of 8 rebar pieces for each lattice) E) Gluing bearing plate with attach retaining nut to cut aluminum tube (shall use soft bonding metal glue) F) Places completed rebar lattices into wood forms. -- Day 3: Thursday 21 July 2022: All Day work (9:30am to 4:30pm) -- 1 hour unpaid lunch A) Mixing concrete (1 person using electric concrete mixer) B) Wheel Barrowing from nearby concrete mixer and pouring into wood forms (2-persons) -- Brick Mason and his assistant will apply necessary techniques to concrete once in form. (As concrete dries in afternoon) C) Assembling rebar lattices (6in x 6in-squares consisting of 8 Rebar pieces for each lattice) D) Gluing bearing plate with attach retaining nut to cut aluminum tube (shall use soft bonding metal glue) -- Day 4: Friday 22 July 2022: All Day work (8:00am to 4:00pm) --1 hour unpaid lunch A) Removing cured concrete pavers/slabs from wood forms with hand trucks and placing in designated yard area. B) Re-assembling wood forms (light use of hand drill for screws) C) Placing 2nd set of completed rebar lattices into wood forms. D) Mixing concrete (1 person using electric concrete mixer) E) Wheel Barrowing from nearby concrete mixer and pouring into wood forms (2-persons) -- Brick Mason and his assistant will apply necessary techniques to concrete once in form. (As concrete dries in afternoon) F) Assisting Brick Mason and his assistant with their other tasks. -- Day 5: Saturday 23 July 2022: Half Day work (10:00am to 2:30pm) A) Removing cured concrete pavers/slabs from wood forms with hand trucks and placing in designated yard area. B) Breaking down and packing up wood forms. -- Bring your own water, energy drink, work gloves, protective shoes / eye-wear (no gloves no work). Shall take information on persons who are interested from 01 July 2022 thru 15 July 2022. Four persons along with a number of backup persons will be selected up until 17 July 2021 by 12 noon or before. Exact Atlantic City address of work will be provide on 18 July 2022 by 8:00am (EDT). While working outside you must wear work gloves, and have protective shoes (Sneakers do not count). Thank You, Walter C. Washington (Victorian House Owner)
Discussion
By posting you agree to the Terms and Privacy Policy.