Description
Looking for hourly labor with concrete flatwork experience to pour concrete around pool under construction. Approximately 13 yards to be poured. Ground is flat, no obstructions and easily accessible. Ground needs to be prepared and looking for a 4" depth on concrete with basic exposed gravel finish.
Owner will purchase concrete and materials but labor for site prep work, forms, etc responsibility of you...basic needs are a 5' pool side, 12' on one end and 8' foot on other.
5' is 50 feet long
12' area is 12x16
8' are is 8x16
Small 8 foot x 3' sidewalk
10'x12' shed pad also needed.
All areas are connected: See sketch below