NEW SIDEWALK CONCRETE NEEDED

Jobs

4911 underwood ave, Omaha NE

Description

We've removed the old concrete sidewalk and now need a new sidewalk poured. Sidewalk is about 4 ft wide and about 90 sq ft. As it now is it averages 3-4" in depth. You'll need to set forms and maybe do a small amount of leveling. Must be done right. Text or email if interested. Located in the Dundee area. Thanks!

By:  view source

Discussion

By posting you agree to the Terms and Privacy Policy.

/
Search this area