Description
I have a creek crossing in Hampshire Tennessee that already has a concrete floor. The pad needs to be raised 4 inches with a 7 inch curb to prevent vehicles from going in creek. It is 48 ft long on both sides making a total of 96 ft. You will be using rebar on 16 inch centers and the concrete will be pumped in. There will be a 22 ft approach on both sides and have 2 ft forms.
I am asking for price on labor and how much if you supply forms.
Please read and make sure you understand what is needing to be done.
Call George 9313349785
Discussion
By posting you agree to the Terms and Privacy Policy.