Install Tile on shower floor

Jobs

Washington DC

Description

Had leakage issues. Old tile was laid incorrectly Need a buildup to slope into drain. And tile laid Already have materials (thinset, liner, levelquick, waterguard,tile etc) Need COMPLETED by tomorrow Send quotes. Preference given to price and availability. Will also need laminate flooring laid in 2 weeks

By:  view source

Discussion

By posting you agree to the Terms and Privacy Policy.

/
Search this area