Description
Need someone for digging.
The main job is to dig two trenches to bury plastic pipe. Dig two shovel width trenches 12" deep, about 100 total feet, put the corrugated plastic pipe in, and backfill. Ground is not super hard and no grass or roots but some spots may need loosening with a pick.
If you have the tools, great. If not I can provide. Other similar work available that day if you have the time and energy.
$18/hr.
Let me know when you can get it done.
Discussion
By posting you agree to the Terms and Privacy Policy.