DESCRIPTION:
Supply all labor, materials, and cleanup for second-level deck renovations located on the back side of a townhouse. I require someone who:
• Has experience with building decks
• Fully insured
• Honest and trustworthy
• Detail oriented
REMOVE:
• Approximately 84 sq. ft. of old pressure treated decking boards
• Approximately 26 lr. ft. of old pressure treated wood railing
• All other construction debris, material waste, and trash caused by the project
INSTALL:
Leave/reuse:
o Leave Foundation
o Transfer aluminum round balusters to new railing
o Leave three front foundational pressure treated 4"x4" posts
o Secure 2”x4” mounted to house
Replace:
o Approximately 84 sq. ft. of Trex® Enhance Naturals Toasted Sand composite decking boards (14 + one end) and install with Hidden Clips
o Approximately 26 lr. ft. of Trex Transcend® Toasted Sand composite railing
o Two old front mid-panel 2”x4” with mid-panel bottom support foot
o Two old side mid-panel 2”x4” with mid-panel bottom support foot
o Three 4"x4" composite posts sleeves
o Three 4"x4" composite posts skirts
Add:
o Approximately 26 lr. ft. cocktail rail (no top caps on posts)