Description
- Repair holes and cutouts in walls. There are some small holes and punctures around the space.
-Replace double doors between the office and warehouse area that were removed
-Repair holes through block wall from interior to exterior of building
-Replace the wall separating unit 4 & 5 that GoPuff opened
-Replace cracked front window with same dark glass
-Remove Freezer / Refrigerator unit and repair area if necessary. Dispose of cooler units.
-Repair roof Penetrations made for use of freezer / refrigerator.
-Replace main entrance door jambs that were removed
Replace door between office and warehouse area that was removed
Discussion
By posting you agree to the Terms and Privacy Policy.