Description
I have about a 15 ft long 6 inch race car in a parking lot that I need someone to come in put on some one by sixes and raise it about 6 inches for the water don't spill over. It's probably a three or four hour job. So it's a six-inch raise curb and I'm water comes in the parking lot it's black over the existing curb so I'm going to want to put a 1.6 on the back of one must become a front real some rebar down into it how about ever for foot just to hold it on there and Elevate that curb with some bags of Sakrete take the form boards off and rub everything out and make it look real neat
Discussion
By posting you agree to the Terms and Privacy Policy.