Landscaping / Trench Gig

Jobs

Acton MA

Description

I need an 18" deep trench dug out roughly 20 feet long.  I did most of the work with a professional trencher already but there are areas where piping is 2' below surface so need to do this job carefully and manually.  I have a post hole digger, shovel, etc.  This needs to happen ASAP preferably tomorrow (Friday) morning.

By:  view source

Discussion

By posting you agree to the Terms and Privacy Policy.

/
Search this area