HCAC Ductwork
1. Replace lower portion of 12”x3”X 4’ tall supply vent and register assembly. (See photos)
2. Install matching supply vent with new register in between studs next to toilet rough and connect to supply trunk line in attic.
Lyndon Ln
Neal Campbell
St Joseph’s Realty
502-345-5929
Text or Call
Discussion
By posting you agree to the Terms and Privacy Policy.