Spring Hydrant Flushing In Village Of Sussex Begins April 18

News

Sussex WI

20 April, 2022

4:58 AM

Description

Press release from the Village of Sussex: April 18, 2022 Spring hydrant flushing takes place the weeks of April 18-22 & April 25-29. Flushing removes natural minerals that have settled in the pipes to maintain water clarity and quality in the distribution pipes. It also allows staff to verify the proper operation of hydrants and valves to maintain firefighting capabilities. Flushing may lead to temporary discoloration of your water. If this happens, open the cold water tap nearest your water meter--usually the basement sink or an outside hose bib--until the water runs clear. This usually takes about 10-15 minutes. This press release was produced by the Village of Sussex. The views expressed here are the author's own.

By:  view source

Discussion

By posting you agree to the Terms and Privacy Policy.

/
Search this area