Want to hire someone to install four metal pipe with concrete footing

Jobs

Phoenix AZ

Description

Install Four 2 inch x 2inch square Metal Pipes (with Concrete Foundations) and Hang Backyard lights Work includes following: Dig 1 feet x 1 feet x 3 feet deep and pour concrete foundation for a 2 inch x 2inch metal pipe . Metal pipe is 15 feet ( 3 feet in concrete and 12 feet out side up in air). Need total Four (4) concrete footing for Four (4) metal pipes. These metal pipes are for hanging backyard lights. (People use tree to hang backyard lights, we do not have trees in back yard). Need to prime or paint the pipes before installation to make it rust proof. Drill or weld J hooks on top of Metal pipes for steel wire. Hang string lights on this steel wire with hooks/fastener. Other side of backyard lights will be connected to Patio Facia / 2x6 wood with J hooks We already purchased four 2 inch x 2 inch metal pipes in 15 feet length You can quote (1) material and labor (2) just labor and we pay for all material separate You have to pick up all materials; will pay extra for pick up Let me know your availability and experience, reference. Location: Near Ray road and Rural road in Chandler/Tempe area

By:  view source

Discussion

By posting you agree to the Terms and Privacy Policy.

/
Search this area