Please dig a circular pit for me that is 15' in diameter and 30in deep. We have a trampoline that I want to set in level with the ground. The legs have been removed. I want a sloped, crater-like pit that is 30in deep at the deepest point. I estimate that there is between 250 cu ft - 300 cu ft (based on the slope) that needs to be moved. The excavated dirt should be spread somewhat evenly across the surrounding area up to 15 feet away. Because of the sloped nature, there is not intent to have a retaining wall or drainage, etc. Just a crater-like pit.
I would estimate anywhere between 20 - 40 hours of digging. Please provide a flat bid for the whole pit.
I have attached images, but they are only examples from the internet of what I want done.