Description
Hey bud! You were in a Toyota Tacoma truck on your way from doing some yard work and hauling. You were wearing jeans and a t-shirt and you were kind of sweaty and dirty. You look like a hard worker and you look strong. You noticed me checking you out and you laughed. We talked a little while you finished pumping gas. You told me that you are great at laying pipe and planting seeds. You seem like a nice guy. I am the guy in the BMW. I lost the number you gave me to call.
ERECTION OF STRUCTURAL STEEL
1.0 DESCRIPTION
The Work shall consist of:
.1 Unloading and erecting structural steel components (e.g. girders, diaphragms, jacking beams,
stiffeners, girder coverplating) as shown and described on the Drawings and in this Specification;
.2 Supplying and installing bearings, including grout pads (where applicable);
.3 Design, supply, fabrication, installation, maintenance and removal of temporary falsework (where
applicable);
.4 Design, supply, delivery, installation, maintenance and removal of erection bracing, temporary wind
bracing, lateral stability bracing, longitudinal ties and other temporary works for structural steel
girders; and
.5 The quality control (QC) testing of all materials and the Work.
The Contractor shall not erect the structural steel girders until the substructure concrete has cured a
minimum of seven days and achieved 80% of the 28 day specified concrete strength requirements.
2.0 REFERENCES AND RELATED SPECIFICATIONS
All reference standards and related specifications shall be current issue or latest revision at the date of
tender advertisement.
2.1 Related Specifications
Specifications for Supply and Fabrication of Structural Steel
Specifications for Temporary Works
3.0 SUBMITTALS
The Contractor shall submit the following to the Engineer, in accordance with the Special Provisions:
.1 Girder Erection Procedure
Discussion
By posting you agree to the Terms and Privacy Policy.