Description
I need someone to run (2) 1" gas lines from the service meters outside a multi-family home to (2) new furnaces, approximately 100 feet each. Assist to install (1) Rinnai heater and an 80,000 mbtu vertical floor mounted furnace. Fabricate sheet metal return with a slot for filter and a few feet of supply ductwork for the vertical floor mount furnace. Plumbing permit is already in place.
Discussion
By posting you agree to the Terms and Privacy Policy.