New construction permitted bathroom: 117 sq ft., ground floor with concrete slab foundation needs drain plumbing installed as slab-on-grade foundation is poured. All dirt work / drain plumbing needed for two sinks, bath/shower, toilet, bidet to bath outlet across foundation wall to septic. Post framing, will need all wall plumbing done for kitchen also so future availability a plus. Please Be Licensed And Have References, provide rough estimate. All materials paid for. Have own tools.
Discussion
By posting you agree to the Terms and Privacy Policy.