Description
Repair exterior of warehouse trim: front, back, side.
Replace missing rafter boards and corrugated metal roof panels.
Pressure wash exterior.
Facia - replace rotted boards.
Soffitt- replace rotted sheets.
Trim- replace rotted sections. Add L-metal.
Siding- overlay fresh siding.
Block - tuck point cracks and holes.
Doors- install seven man-doors.
Dock impact beams - replace.
Caulk all and prep for paint.
-Block work and garage doors installed by others.
Pay: $150/day labor. You need your truck and tools.
Reply with photos of your siding work, name and number and describe your experience.
Discussion
By posting you agree to the Terms and Privacy Policy.