I am looking for an electrician who may have three of four feet of 3", Schedule 80 PVC pipe.
I also need someone who can do a change out by replacing a metered main panel, with a non-metered sub panel. Most of the connections are in the box, but there are two different sections of metal conduit which need to be attached from the side.
If you have some of this Schedule 80 pipe, please contact me as soon as possible.
Discussion
By posting you agree to the Terms and Privacy Policy.