Description
This project involves site work for a new construction building. All materials and equipment will be provided on site. The job has three parts below. Please be prepared to provide a reference and a couple of examples of similar projects that you’ve done recently.
Install Utility Trench
- Saw cut concrete driveway 4” thick, 2’ wide and 105’ in length
- Dig utility trench 12” – 18” deep, 1’ wide and 210’ long using a walk behind trencher
- Lay three 1.5” pipes, one 1” pipe, and one 2” pipe in the trench
- Connect two 1.5” pipes to water meters and one 2” pipe to a 4” lateral using a fitting
- Compact and backfill the trench
- Pour concrete 4” thick, 2’ wide, and 18’ long (about ½ cu. yd) to repair a portion of the driveway
Install Ejector Pit
- Dig pit 7.5’ long x 3’ wide x 4.75’ deep
- Form 6” walls around sides of pit reinforced with #4 rebar at 12” O.C. both ways
- Pour concrete walls (roughly 0.4 cu yd) and strip forms
- Lay 4” crushed rock base
- Install grinder pump and sump pump. Connect supply, drain, and vent pipes.
- Frame roof and trap door for pit
Install Concrete Stairs Below Grade
- Concrete staircase will consist of a 3’ x 3’ landing that is 2’6” below grade and three stair treads 3’ wide
- Compact soil beneath stairs and landing (area of 23 sq. ft.) and lay waterproofing material
- Form 6” retaining walls around sides of staircase and landing reinforced with #4 rebar at 12” O.C. both ways
- Form staircase consist of three treads each 3’ wide
- Pour concrete (roughly 1 cu. yd.)
- Remove forms
- Put roll on waterproofing membrane on outside of retaining walls
- Backfill around staircase