Need Gas Line Installed.

Jobs

Parker CO

Description

I need a gas line installed and up to code. Having own tools and being able to thread a pipe on the spot is a must. This is something that needs to be done right away. I am not looking for a handy man. This will be a total 35 LF of pipe. Will need to install a termination plate to the legger board for the out side and get all of the pipes to 3/4 thickness.

By:  view source

Discussion

By posting you agree to the Terms and Privacy Policy.

/
Search this area