1) Skid steer w forks to handle concrete pipe
2) Unload 60’ concrete pipe and end pieces
3) Trench is dug but verify and perfect
4) Set 18” pipe and end pieces to code
5) Prep and set forms and steel (inspections)
6) Pour and set concrete (inspection)
7) Remove forms and clean