Weekend, or weekday, 3 p.m., short hours, near Oregon City High School with me, female.
Most Immediate NEED is TO REMOVE a 30" 4x9 header and 36" 4 x 9 header,
Replacing with a 6 foot wide 4 x 9 header.
Replacing 3" front door with a 3'6" front door and 2"6" sidelight, 6 foot wide.
Next, fastening 8" tall round log posts to house and to platforms 6 feet out from porch to build new roof.
Already started front porch and stair railing. Round posts between rails.
Have portable scaffoldings and tractor.
Later: Loft rail, have all materials and tools for everything already.
Later: have platform built on my heavy timber beams, for installing T&G, sanding and painting of beams inside the house. T&G starts at the 11 foot mark to 18 foot mark in kitchen.
Tile, cultured stone,.
Electrical - a couple more outlets. 3 more gutter downspouts.
Plumbing - a couple drains have to redone proper slope.
Discussion
By posting you agree to the Terms and Privacy Policy.