Description
The current paint on the driveway is fading, chalking and flaking off. The surface must be prepped and the repainted. We have already purchased all needed materials and have rollers, tape, and a pressure washer. All that is needed is the labor. The driveway is roughly 725 sq ft total. Since drying time is needed between steps it will likely need 3 to 4 days of 3-4 hours each.
Discussion
By posting you agree to the Terms and Privacy Policy.