Quick Plumbing Job

Jobs

New Albany OH

Description

Quick Plumbing Job Cash payment for attaching a 2” drain and a 1-1/2” drain to an existing 3" line. PVC piping. All work will be conducted in a basement where no drywall or lumber needs cut. We need two drains attached to the larger drain pipe in our basement. All water supply lines and drain vents are completed. The two drains are completely run to the basement. They are vertical drain pipes with rough-in through the basement ceiling. The only work to be conducted will be to complete the short run and connect to the existing 3” vertical drain. The items to be attached are a 2” washing machine drain and 1-1/2” sink drain into the existing 3” drain. The 2” is a rough-in into the basement ceiling. It is approximately 7’ from the 3” drain to which it will attach. The 1-1/2” is a rough-in into the basement ceiling. It is approximately 2’ from the same 3" drain to which it will also attach. No rubber boots to be used. Must use PVC. We will pay cash for the job. We will pay for the needed material. We need price quotes for the job. Attached is a series of pictures.

By:  view source

Discussion

By posting you agree to the Terms and Privacy Policy.

/
Search this area