Licensed Plumber-

Jobs

Wallingford CT

Description

Looking for a quote for the following. 1. Relocate Upper ball and drain valve to lower incoming loop. 2. Remove existing ball valve behind wall that feeds irrigation resolder main line back together. Solder Elbow to line heading out to irrigation. Relocate the ball valve into boiler room (Pipe already run). Cut in T ftgs on main line and solder new ball valve into place. 3. Relocate and replace Hot water ball Valve the feeds Jucuzzu tub- 2nd floor from above beam. Ball Valve has sediment build up and needs to be replaced so relocating as well.

By:  view source

Discussion

By posting you agree to the Terms and Privacy Policy.

/
Search this area