Need help installing a new laminate floor onto smooth level concrete floor in basement. Floor will be floated over plastic sheeting. It would be great to have 2 people doing the installation setting the boards in place and we will do the cutting at the edges. Should take about 5 to 7 hours to complete. We have the necessary tools and materials. Should be pretty simple, just needs willing happy hands to help. (we have knee-pads )
Would like to do the work Monday or Tuesday, December 27th or 28th.
Prefer phone calls. 360-nine six one-0359.
Discussion
By posting you agree to the Terms and Privacy Policy.