In-Field training/coaching for Lead Safe home remediation; the process by which a property has undergone work to reduce lead hazards (RRP).
There are two types of Lead Remediation though Lead dust hazards can always be present.
1. Interim Controls are temporary mitigation strategies that need to be monitored including an environmental clean, at minimum, covering bare soil (mulch), and stabilizing deteriorated paint.
2. Abatement is the longer-term mitigation strategy that can last up to 20 years. It includes removing and replacing components (i.e. windows & doors), or covering large surfaces including walls, ceilings, & exposed soil (i.e. remove and replace soil or pave-over) to ensure property is free of all traces of lead.
To comply with the new lead-safe law, the remediation process employs interim control activities to address researched and tested signs of lead risks and hazards. Interim controls are measures that are taken to ensure a property is lead safe.
Mandatory orientation is required on day one prior to participating in the week's training.
NOTE: If we don't receive a minimum of 3 registered for the class, we will cancel the event.
Contact: Kim Foreman, Environmental Health Watch
Email:[email protected]
Call: 216-961-4646 x 100
Discussion
By posting you agree to the Terms and Privacy Policy.