Hello, we are remodeling our small bathroom and need it done before Christmas. We already have all of the tile here and have started the demo as well. We are going to turn the shower into a steam room so we have to install the steamer plumbing as well. We will need floor to ceiling tile in the general area of the bathroom, but in the shower area we will need to do the ceiling in tile as well because of the steamer.
The following is what I am looking for:
Demolition of the drywall, cast iron tub, and possibly sub floor.
Install drywall on ceiling
Install Bathroom Ventilation Fan
Install hardy board (backer board for tile)
Install Steam Shower (I have an electrician to wire up the steam machine)
Install New Tub and Glass Doors
Install Tile
Install Rain Shower and New Fixtures
Get the bathroom to completion.
We also need a bathroom & shower installed in the basement, but we will see how this goes first. I do some remodeling myself, so I can help or will be doing some of the stuff you don't get to. We are willing to do cash under the table if that helps. I would prefer if you have liability insurance and references as well. I am very picky about quality, so if you half ass stuff, don't bother. Thank you for taking the time to look at this.