Description
A property is being remodeled and there is about 700sqft added to the second floor. I need to run some AC ducts to the new rooms. A new 3.5 ton unit is already installed. We have an approved permit on hands for this job. Everything is ran through the attic, the handler is in the attic, you can stand and walk in the attic freely.
Here's the scope:
Run 3 new supply lines
Run 1 new return line
Expand the return box to fit the new return line
Run and connect new bigger copper pipes
Connect everything and seal all new and original ducts and boxes, lots of them
Pump in refrigerant, test the system
The work will be inspected so we need everything done by the book. We already have another 4 new supply lines layed out and installed by the previous contractor, they are not sealed in yet. I have most of materials already at the site. New rooms don't have drywall on the ceilings so very easy to run the ducts.
Looking to get this project done before Friday. Please don't reply if you're busy.