Description
I have a mini split on order. When you arrive, the head unit and heat pump will already be mounted and the electrical completed. I need a line set installed.
Please quote the following:
1) Flare and install 1/2" and 1/4" line set. Torque to spec. Line set length will be approximately 15'. Include materials in your quote.
2) Triple evacuation of line set with nitrogen. After system equalizes, must hold 500 micron for 1 hour.
3) Release refrigerant from heat pump and leak test.
4) Stick around for test run.
Discussion
By posting you agree to the Terms and Privacy Policy.