Community Invited: Workshop About Edmonds Hwy 99

News

Edmonds WA

14 November, 2021

6:26 PM

Description

Press release from the City of Edmonds: November 3, 2021 The City of Edmonds is in the process of designing gateway signs at the northern and southern city limits on Highway 99 (as part of Hwy 99 Revitalization and Gateway project / Stage 2). This portion of the project is currently in the conceptual design phase. The community is invited to the second online workshop to discuss the new signage on Wednesday, November 17th at 6pm. The first community workshop took place on August 4th, 2021 to provide general project information about the two gateway signs. Following that meeting and an online survey, the community provided input on their preference regarding the general layout of those signs. Using this initial feedback, several general gateway design options have been developed. This second community workshop is scheduled for November 17th from 6pm to 7pm where these design options will be presented. To attend the Zoom workshop, follow this link: https://us06web.zoom.us/j/83755582012?pwd=REFURjlwWE53YWN4N0s2UWV0VkNOUT09 Meeting ID: 837 5558 2012 Passcode: 984167 Dial In Information 253-215-8782 Following the meeting, an online survey will be available allowing the community to select their preferred design option. This survey will take less than 10 minutes to complete and the deadline for completing the survey will be November 31st, 2021. This input will then enable the design team to begin the design phase on the preferred options. To access the survey, go to the following link (available shortly prior to the meeting): https://www.surveymonkey.com/r/HWAY99CW2 The gateway signs will be constructed and installed with the upcoming Highway 99 Revitalization & Gateway project (Stage 2). In addition to the gateway signs, the project will convert the existing center two-way left turn lane from 244th Street SW to 212th Street SW to a raised median with mid-block left turn pockets along certain sections. This will also include landscaped median and traffic curb along other sections to improve safety along the entire corridor. The current schedule is to complete the design phase of this project in early 2022 and the construction phase in late 2022. To learn more about the project, go to the following link: https://www.edmondscorridor99.org/. Please contact Mr. Bertrand Hauss at (425)754-5325 or [email protected] for the following: 1. Request general information about the project. 2. You may request, free of charge, language assistance services for information about this project in another language or translation services during the public meeting. Comuníquese con Bertrand Hauss al (425) 754-5325 o [email protected] para lo siguiente: 1. Solicitar información general sobre el proyecto. 2. Puede solicitar, de forma gratuita, servicios de asistencia lingüística para obtener información sobre este proyecto en otro idioma o servicios de traducción durante la reunión pública. This press release was produced by the City of Edmonds. The views expressed here are the author's own.

By:  view source

Discussion

By posting you agree to the Terms and Privacy Policy.

/
Search this area