Description
I have a Deck-Catwalk project that will require approximately 600-700 SF x 6.5" Deep of Dirt removed so we can build our deck-catwalk to grass-elevation. 90% of the dirt will have to be hauled to the dump. The other 10% needs to be left for back fill once we frame it. The drawings in the pictures attached give a solid lay out. All lines will be moved prior to digging by our crew.
I WANT A TURNKEY LABOR BID TO DO THE EXCAVATING AND REMOVE THE DIRT FROM THE PROPERTY. THIS PROJECT WILL START NEXT WEEK HOPEFULLY.
I AM ALSO INTERESTED IN THE HAULING BID SEPARATED FROM THE EXCAVATING IF YOU DO ONE OR THE OTHER PLEASE SPECIFY.
Discussion
By posting you agree to the Terms and Privacy Policy.