Description
There are 2 air ducts that are hooked up and prepared to be anchored respectively to where they should to the floor. The problem is the floor was installed before the air ducts were ran so now the floor must be cut respectively to where the duct should run. I know one duct should go into the bathroom. I can’t really say for sure where the other goes.
I need this done ASAP as the house is cooling as it should.
Discussion
By posting you agree to the Terms and Privacy Policy.