Assistance Moving Soil

Jobs

Arlington VA

Description

Need someone to dig out soil in a planter bed 8' x11' x 4' deep. Soil will be disposed on-site within roughly 60' of the dig area. The soil is behind a low masonry wall along the 8' foot side which can be demolished and disposed on site.

By:  view source

Discussion

By posting you agree to the Terms and Privacy Policy.

/
Search this area