Description
I'm installing a chin-up bar. I need two holes dug for the posts. The holes only need to be 1-1/2 ft deep, but they must be at least that -- all the way down -- and one foot wide, even at the bottom. I have a pointed digging shovel and a sharpshooter shovel that you can use. (I do not have post hole diggers.)
The holes are 4 ft from a tree, so you might encounter some roots. I have a saws-all to cut those. I also have a rock bar if needed.
I'll pay $50 per hole ($100 total) -- whether your work by yourself or bring a friend to help.
There is also a mound of dirt (from previous digs) that I need moved. It's about 6 feet long, by 3 ft wide, by 2 ft tall. It should be easy digging. I have a wheelbarrow that you can use. I need the mound moved to another location about 20 feet away.
I'll pay $100 to have the mound moved -- whether you work by yourself or bring a friend to help.
Discussion
By posting you agree to the Terms and Privacy Policy.