Need All Construction Trade
Jobs
Frankford Ave, Philadelphia PA
Description
Growing General Contractor Company specializing in Philadelphia Residential renovation looking for qualified subcontractors to consistently give work to in their particular trades. Particular sub-contractors will be licensed and insured and able to start jobs without deposits. Materials for jobs can be purchased on General contractors credit line. Job Location : 2510 Wetherill St Chester, PA 19013, Siding: Install new vinyl siding on the second floor of the property. Stagger the siding end laps so that no two courses (rows of panels) are aligned vertically. Cap the outside of 22 windows with aluminum capping and caulk Capping to have Drip edge where needed. Cap 4 exterior doors, and repair 2 exterior door. Gutters &Downspouts: Replace damaged gutter on the shed Plaster/Drywall: Replace water damaged sheetrock walls and ceiling in the living room and 2nd floor bedroom. Repair damaged drywall beside the stairway. Tape and Spackle, Install 1/2" sheetrock over mentioned walls where damage is beyond repair. Use a minimum of 3 coats of spackle after taping on all new drywall. Decorating: Paint installed drywalls. Paint kitchen ceiling. Paint Ceiling white with premium Glidden latex Flat paint 2 coats throughout kitchen ceiling. Finished Floors: 1700 sf of luxury vinyl tile on first and second floor. Ceramic Tile: replace the Kit backsplash in both kitchens. Remove and reinstall the toilet and vanity. Replace one bathroom floor and one kit floor Install new durock brand next gen 5 ft. x 3 ft. water-durable, mold-resistant panel cement board or equivalent and new ceramic tile using TEC Tile adhesive which Meets ANSI A136.1 Type l & ll and is Mold- and mildew-resistant, grout with Polyblend sanded or non-sanded grout with polymer-modified to produce hard, dense joints that are resistant to shrinking. Plumbing: Replace damaged soil line in crawl space as needed. Heating: Install a heater and air conditioning unit for the first floor. service the boiler for the second floor Basement/Crawl Space: Install a sump pump Job Location : Thouron Ave, PA 19150 Exterior Paint : Paint the rear lintel Interior Doors : Replace 4 interior doors Plaster/Drywall : Install sheetrock for second floor bedrooms, Re Sheetrock basement walls. cut and patch damaged drywall in the mentioned area. Install new 3/8" drywall with screws to the joist every 12" apart. Tape, compound and sand and make the mentioned area smooth, flush and tape, spackle, and sand and make ready for paint. Decorating : Paint the whole house and basement Wood Floors : Refinish floor for the whole property : Scrape and sand wooden floors to smooth surfaces using floor scraper and floor sanding machine, and apply coats of finish. Ceramic Tile : Install new ceramic tile for the kitchen, install new kitchen backsplash, Install new bathroom floor for basement and second floor, Install new bathroom tub surround, Install new ceramic tiles for bathroom walls Install new durock brand next gen 5 ft. x 3 ft. water-durable, mold-resistant panel cement board or equivalent and new ceramic tile using TEC Tile adhesive which Meets ANSI A136.1 Type l & ll and is Mold- and mildew-resistant, grout with Polyblend sanded or non-sanded grout with polymer-modified. Bathroom : Install new toilet and vanity for second floor and basement bathrooms install new bathtub, medicine cabinet and new tub faucet for second floor bathroom. Cabinetry : Install new cabinets with island, Install new with k series from Forever mark assembled base and wall cabinets or equal along with the hardware. The cabinets are of wood construction with soft closing drawers and the coating is of superior scratch resistance quality. Install granite countertop with enhanced antimicrobial protection along with superior scratch / scuff resistance along with new kitchen sink. Clean-Up : Demo 2 kitchen walls. Remove and demo bathroom fixtures. Demo and remove any debris in the basement. Remove all non load bearing interior walls in the basement. Clean property and remove all work-related debris Job Location : Temple Road, Philadelphia, PA Gutter/downspout : Provide and install all new/repair existing gutters, downspouts leaders and splash blocks for the entire house as required. Assure proper connections and sloping of gutters and leaders. Downspouts to be anchored to walls in at least 3 places. Assure water is diverted onto splash blocks that move water from the base of the building at least 6 feet and that water does not run back towards the dwelling. Assure code compliance for installation. Roof : Provide and install new flat roof for the side basement entry. Remove and dispose of existing roof as required. Replace all deteriorated sheathing and wood trim as needed. Provide and install new downspouts, leaders and/or splash blocks as needed. Assure proper flashing. Seal roofing as per manufacture requirements. Contractor to provide homeowner all manufacturer and labor warranties. Contractor to secure permits, inspections and sign offs as required. Contractor to ensure that house is protected from elements at all times, as required. Walks : Remove and Replace 40 SQFT concrete walkway. fill cracks in concrete walkways Exterior Paint : Repair and paint all exterior wood trim where paint is chipping, peeling and or failing as needed. Window : Repair existing windows as required. Assure all window installations comply with local codes. Insulate and seal per manufacturers requirements. Contractor to secure permits, inspections and sign offs as required. Exterior Doors : Provide and install 2 new exterior entry doors for the front and the basement. Interiors Doors Provide repairs to existing entry and closet doors as required (12doors). Includes framing, hardware, trim and lock sets as needed. Partition Wall : Repair framing as required due to water damage from leaking pipes. Drywall/Prep : Repair wallboard/plaster throughout as required. Plaster : Tape, spackle and sand all joints and fasteners to prepare for painting. Decorating Paint new sheetrock (in the first floor living room around the bay window) with one coat of primer and 2 coats of flat finish paint. Stairs : Install wall handrail from first to second floor and basement Finished Floor Provide and install new finish flooring as follows: 1st floor living areas - carpet 1st floor kitchen - linoleum 2nd floor bathroom - vinyl tile 2nd floor kitchen - linoleum Bathroom Remove the toilet and vanity in both bathrooms. Install 2 new toilets. Install 2 new vanities. Install new faucets and connect new fixtures to existing plumbing. Cabinetry : Repair existing kitchen cabinets as required. Check code compliance for all general building, plumbing and electrical installation. Clean-Up : Remove all trash from the property. Demolish and remove all finishes and stored items required to accommodate construction. Complete demo of basement level unit to the studs and return to basement storage only. If you are interested send me a text and I will text you back right away if let me know the following: Your name (*Required) Your TRADE (*Required) Your phone number Where you live What tools you have Your experience Do you have a vehicle, If yes what type of vehicle do you have
Discussion
By posting you agree to the Terms and Privacy Policy.