Description
Have a job that needs (820)sq/f hardwood installed.
You must have your own tools (floor nail gun, table saw, chop saw)
Be good or you will be sent home in the first 10min.
4 inch planks, must be nailed.
Some floor prep is needed to reduce squeaking, plain down high spots and nail down subfloor as needed.
Discussion
By posting you agree to the Terms and Privacy Policy.