Description
I am dismantling my 14ft climbing wall. I have
- several 3/4” plywood 4x8 with hold bolts installed. Also treated with waterproofing.
- 2x6 and 2x10 and 2x4 pieces around 14’ long also treated.
See pics
For you to come pick up before the end of Aug. in Alameda.
Pics are after I removed most of the plywood. Pulling down the frame today. (I hope)
Discussion
By posting you agree to the Terms and Privacy Policy.