Installation of Floor Transition Strip

Jobs

New York City NY

Description

I have a 30" doorway which needs a new floor transition strip installed as the current one has a huge crack in it. I would need the person who is installing this to provide the strip (which should be about 30" long and 3 to 3 1/2 inches wide). The strip will probably have to be nailed down which would require a nail gun or something like that. Overall the entire process shouldn't take longer than 30 minutes. Please reply with a quote. I can provide pictures if necessary.

By:  view source

Discussion

By posting you agree to the Terms and Privacy Policy.

/
Search this area